
New TopShim run:

version = topshim 2.0.0
date = 2022-03-24
time = 09:35:04.478
command = topshim  convcomp rga

FINE SHIMMING

Parameters:

probe = Z168777_0001
solvent = CD2Cl2
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 5.32 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  3: FWHM Before= 0.5 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration  4: FWHM Before= 0.3 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration  5: FWHM Before= 0.3 Hz, Target= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.346

shim changes: 
Z	+59
Z2	-70
Z3	-23
Z4	-130
Z5	+52
Z6	+526
Z7	+531
Z8	-4762

duration = 1 min 8 sec
completed successfully
finished Thu Mar 24 09:36:11 2022


========================================================================
